Every job carried out on board, newest first. These are a record of work done — they’re not on a schedule.
June 2026
29 Jun 2026Charter Land Support & Turnaround Charters / As required Support: Provided general land support for charters, including collecting items, assisting guests and providing quick vessel turnaround assistaCharters
27 Jun 2026Charter Prep & Guest Assistance Charters / As required Tender: Fuelled the tender. Provisioning: Assisted with provisioning. Guests: Assisted guests.Charters
27 Jun 2026Errands & Provisioning for Charter Charters / As required Errands: Sourced and collected a backup tender battery, a battery jump pack and a solar charge kit for the tender. Provisioning: Collected proCharters
27 Jun 2026Provisioning — Galley Prep Charters / As required Provisioning: Picked and collected goods from multiple suppliers, unloaded them to the vessel, and unpacked and organised them, ensuring the galley waCharters
26 Jun 2026Full Washdown & Detail Wash down & detailing / Weekly Washdown: Completed a full boat wash down and detail. Covers: Removed covers. Tender: Tested the tender. Water Toys: Set up the Fliteboards.Scheduled
26 Jun 2026Charter Prep — Dockside Day Charters / As required Charter Prep: Completed a dockside standby day in preparation for charter.Charters
26 Jun 2026Fliteboards, Linen & Provisioning Charters / As required Fliteboards: Assembled the Fliteboards. Linen: Collected clean linen and a parcel from the office. Tender Battery: Sourced a tender battery, laCharters
25 Jun 2026Linen & Provisioning for Charter Charters / As required Linen: Collected and dropped off dirty linen. Provisioning: Sourced and delivered dry-goods provisioning. General: Organised the vessel in readiCharters
23 Jun 2026Fuel Dock Washdown & Fob Organisation Wash down & detailing / Weekly Fobs: Organised marina access cards/fobs. Washdown: Met the vessel at the CSM fuel dock and assisted with the external wash down anScheduled
20 Jun 2026Full Washdown & Departure Prep Full washdown and prepping the boat for departure.Scheduled
19 Jun 2026Desalinator Pump Install & Tender Launch Desalinator: Installed the Davey pump under the stbd crew deck, flushed with freshwater, returned valve to seawater supply. Lighting: Replaced blown fluoro tubUnscheduled
19 Jun 2026Pre-Departure Coordination Pre-departure preparations — coordinated crew and trades, loaded and stowed items, radio checks and nav checks.Scheduled
18 Jun 2026Teak Clean & New-Crew Induction Teak cleaning. Inducted and guided Gracie (new team member). Loaded items from the container to the vessel and checked them.Scheduled
18 Jun 2026Washdown & Equipment Organise Fitted covers. Washed the vessel down. Removed tools and equipment from the lazarette and organised all gear — cleaning supplies, tools and snorkelling equipment.Scheduled
17 Jun 2026Interior Reinstate & Clean Refitted deck cushions and covers. Cleaned all bathrooms — showers, toilets, sinks and mirrors. Returned galley items to cupboards, remade beds and tidied the main salon.Scheduled
17 Jun 2026Trim Tabs — Faulty Relay Replacement Investigated a trim-tab fault. Extensive testing narrowed it to a faulty relay on the trim-tab PCB. Disconnected the board, unsoldered the faulty relay, soldered iUnscheduled
15 Jun 2026Anchor Bow Roller — Fit & Test Collected the modified anchor bow roller from Nautilus, fitted it and tested operation. The anchor now aligns correctly, though care is needed on retrieval to watch the Unscheduled
14 Jun 2026Rub Rail Re-fit Reattached the rub rail and applied Sikaflex to cure overnight.Scheduled
10 Jun 2026Anchor System — Bow Roller Modification Removed the bow chain roller for modification — bolts required drilling to remove. Delivered the bow roller to Nautilus for remake, to create a shoulder so the Unscheduled
09 Jun 2026Re-Seal Top Deck Wings (Sikaflex) Removed and replaced the Sikaflex around the top-deck wings.Unscheduled
09 Jun 2026Heavy Cut & Ceramic Prep — Bow & Port Superstructure Heavy-cut the bow twice and prepped for ceramic coating. Heavy-cut part of the port-side superstructure.Upgrades
09 Jun 2026Yard Works — Contractors, Quotes & Roof Continued yard works — met contractors, gathered quotes, polished and waxed the roof.Scheduled
08 Jun 2026Ceramic Coating — Aft Areas Ceramic-coated the aft areas and swim platform.Upgrades
08 Jun 2026Yard Works — Rub Rail Removal General yard jobs — removed the rub railScheduled
05 Jun 2026Prep for ceramic on the back quater panels and swonson.Upgrades
05 Jun 2026Ceramic Prep — Aft Panels & Swim Platform ● UPGRADE Prepared the aft quarter panels and swim platform for ceramic coating.Upgrades
May 2026
21 May 2026Applied corflute protection to aft deck and platform Connected shore power.Unscheduled
15 May 2026Travel to SC Pre-Start checks Moved vessel to Boat Works Unload tender Closed 7 Hull ball valves Connected shore power on hard stand Remove anodes / One anode portside, requires holding inner bolt. Spinning.Scheduled
15 May 2026Relocation Sanctuary cove - Boatworks Inc towing broken down tenderScheduled
April 2026
11 Apr 2026Full wash down remove all covers/prep for charterCharters
10 Apr 2026Return vessel to Sanctuary Cove, refuel with 2000 litres return to berthDeliveries
10 Apr 2026Secure guide cables for interior blinds / Refueled, took on 2000 litres / Moved boat to SCDeliveries
09 Apr 2026Relocate vessel from sanctuary cove to GCCM,take forklift to container and put back stores fishing gear esky’s BBQ and lots of other gear to boat/ pick up & install new tender cradle / and test fit tender to swin platformDeliveries
09 Apr 2026Interior collected linen/towels to be laundered/ general charter check final prep & fridge wipe overCharters
09 Apr 2026Relocate vessel to GCCM Reload with items from the container Relocate tender to GCCM load onto swim platformDeliveries
04 Apr 2026Meet Jay to collect Yacht Controller Take to vessel and test 2 hrs Incuded on MMFUpgrades
02 Apr 2026Vessel Sea Trial with twin disc techs on board to reslove stablizer issues / discuss otehr annual maintenence items with SBRepairs
01 Apr 2026Cleared out blockage in window & drain/ replaced hoses to resolve water ingress to saloon aftRepairs
February 2026
12 Feb 2026Collect and reinstall StarlinkUnscheduled
09 Feb 2026seat covers adjusted and put on, clips fixed, window covers adjust and put on covers for the full exterior of the boatUnscheduled
07 Feb 2026Reinstall panels, blinds, fine exterior/interior detail and set up for inspectionUnscheduled
06 Feb 2026Start preparation for inspectionUnscheduled
02 Feb 2026Work on water maker to free up high pressure pumpRepairs
January 2026
29 Jan 2026Check & reset shore power following stormUnscheduled
28 Jan 2026Install & Test bilge pump at fwd engine roomRepairs
28 Jan 2026Galley clean down and wipe out and iron bedrooms during shipwright worksUnscheduled
27 Jan 2026Supply install & test replacement windscreen washer hosesRepairs
24 Jan 2026Give access and instruct carpet cleaner Restore power to vessel after noticing lack of power on arrival Included in MMF 1.5hrsRepairs
23 Jan 2026General interior clean up during interior floor shipwright floor replairs/ remove and relocate furnoture for shipwright accessUnscheduled
22 Jan 2026Seal portside window with Sika to stop water ingress to vesselRepairs
22 Jan 2026Collect repaired sliding door release handle from Wicked /Fitted handle to doorRepairs
21 Jan 2026Remove old radar reflector from roof / romve starlink for wrap/ assist Bruce - remove ER bildge pump for replacement /Repairs
21 Jan 2026Cleaned generator water strainers Replaced black sikaflex around portside exhaust vent and other areas Replaced broken TVRepairs
20 Jan 2026Refit 2 doors on aft deck lockers Used filler to repair screw holesRepairs
15 Jan 2026prep vessel for broker inspection / remove all blinds for repairsUnscheduled
15 Jan 2026Prep for inspection all covers off clean windows spot clean. After inspection all covers back onUnscheduled
05 Jan 2026Investgate water ingress to main saloon / water test several areas & remove interior panels to identify source of leak at port side helm windowRepairs
December 2025
30 Dec 2025Mask prep and lay black sika onto filled port side window x2 Curing time for final 24/48 hrs Mark out, machine cut out all rotted flooring, clean, remove wet underlay in preparation for new floor overlay.Repairs
29 Dec 2025identied source of water ingress of port side windiw reulting of damaged flooring to be replaced. initial prep and sika fill of leaking port side windowRepairs
17 Dec 2025Sea Trial Remove remaining cold stores off boat relocate vessel from GCCM to SC and sea trail following Engine servicesScheduled
17 Dec 2025Sea Trial relocate vessel from GCCM to SC and sea trail following Engine services Diagnosing joystick/thruster faultsRepairs
16 Dec 2025Relocate vessel from sanctuary cove to GCCM strip boat and place gear in container 10Deliveries
16 Dec 2025store and pack away items upon arrival to GCCM. in prep for repairs works on boardDeliveries
16 Dec 2025General assistance with moving Azimut, store and pack away items upon arrival to GCCM. in prep for repairs works on boardDeliveries
11 Dec 2025cleaned out camp fridge of frozen spillage, relocated it to saloonUnscheduled
08 Dec 2025Travel to SC Reset shore power connection Was not switched to shore power / Moved boat stores from aft crew compartment to deck and saloon Cleaned aft raw water strainer for AC/ Found plastic bag in strainer / Cleaned raw water stUnscheduled
04 Dec 2025Hull Descalling calcium and mineral wash pt/ stb hullScheduled
November 2025
24 Nov 2025Found no fresh water in tanks / Filled water tanks / Found desal set to flush. Reset valve position / Moved equipment, stores to undercover aft deck / Check on water ingress to saloon floor / Removed covers and furniture fittings Repairs
06 Nov 2025Launch tender Tow tender to Boat Works SD MarineDeliveries
October 2025
21 Oct 2025Interior turn aroundCharters
20 Oct 2025Collect and deliver linen to vessel plus carry out checksScheduled
16 Oct 2025Dockside Day rateUnscheduled
16 Oct 2025Refuel vessel and drop linen off to be cleaned.Deliveries
15 Oct 2025Dockside Day rateUnscheduled
14 Oct 2025Assist with lines and pack up Everywhen after owners tripCharters
07 Oct 2025Prep for charter / interior detail / assist with refuelCharters
07 Oct 2025Deliver wifi extender to vessel and collect replacement tender with Dan.Deliveries
03 Oct 2025Refuel and clean in readiness for charter.Charters
September 2025
19 Sep 2025Washing Machine Install Adjust height of washing machine to suit. / Secured machine into position and connected water supply, drain and power. / Tested,ok /Recheck water supply. Ok / Reassembled door and wall in master cabin WashiUpgrades
18 Sep 2025Collect washing machine from marina storage, assist Bruce to get into position via master suite. Rubbish removal.Upgrades
18 Sep 2025Washing Machine Install Diisantled door and wall around washing machine to gain access Collected washing machine from storage, unpack and begin installation. Machine sitting too low, door could not open. / Used courtesy car /PickeUpgrades
04 Sep 2025Post Charter wash Down Teak scrub, washdown, maintenanceCharters
04 Sep 2025Interior turn over, teak clean and wash downCharters
04 Sep 2025Clean teak decks organise electrical parts and linen drop off,Charters
02 Sep 2025dockside 1/2 DayCharters
02 Sep 2025Full rinse, covers on, pack up toys, repair shore power lead. Aircon guys & Start Wash down onsite carrying out repairs.Charters
August 2025
22 Aug 2025Dockside 1/2 day NO CHARGECharters
22 Aug 2025Reconfigure foil boards, pack up covers, assist Owner with provisioning onboard and aid departure with DanCharters
21 Aug 2025Meet Jack and Dan onboard, brief sea trial, dump black tank, refuel vessel approx. 1950L, clean exterior, run and flush tender.Charters
21 Aug 2025dockside / vessel induction / refueling / sea trail / general charter prepCharters
21 Aug 2025dockside 1/2 day - Vessel induction, sea trial and refuel.Charters
20 Aug 2025Start vessel preopCharters
20 Aug 2025dock side day / start vessel prep / repairs to tenderRepairs
19 Aug 2025Dress Beds/ LinenCharters
July 2025
17 Jul 2025Detailing, Refuelling, prep boat for owners arrivalScheduled
17 Jul 2025dockside day rateScheduled
16 Jul 2025dockside day rateScheduled
10 Jul 2025remove glass inset from crew lights to use in saloon ( replace broken lenses) install bulk head at entry / test and check platform hydraulic for leaks refit helm panels /self amalgamation tape on vhf hand units to protect wireUpgrades
09 Jul 2025Desalintor / Refitted HP membranes after small service from MSA Tested good no leaks /Check on no water mixer operation in showers Called in Zac for assistance / Removed valve assembly and inspect Found hardened control valve sealRepairs
03 Jul 2025Desalintor Supplied and fitted HP gauge to Desalintor with modified mounting bezel / Operate desal and test, set pressure at 5400kpa. /Operation OK, however some water leaks around HP membranes./ Removes membranes for repairs, delRepairs
June 2025
27 Jun 2025Travel to Oxenford to collect new large water filter housing Replaced water filters on desalintor / Supplied and Replaced bulkhead lights in crew/ER companion way /Began removing fwd stairway to fit washing machineRepairs
26 Jun 2025Desalinator / Check operation /Found high pressure gauge has failed, showing 0 pressure when running. Oil inside gauge appears discoloured. Removed gauge for replacement HP gauge was of small dimensions, and not readily available.Repairs
25 Jun 2025Modified shelf in water pump cupboard to accommodate tools supplied /Fitted new Anchor control pads to lower and upper helmUpgrades
20 Jun 2025Supplied and delivered hand tools to vessel 2 hrs No ChargeUnscheduled
18 Jun 2025Used black sikaflex to reseal cover panel on top deck port following starlink installUpgrades
16 Jun 2025Chain counter cable /Comms cable through to forepeak from lower helm /Passarel /Fitted painted door to Passarel // onnected door closure cable /Tested OKUpgrades
16 Jun 2025Assist with anchor re wiring in bow hullUpgrades
12 Jun 2025Chain counter cable / Began fitting control pad at lower helm, connected power and test ok /Backing plates required for mounting, ordered from Wicked /Began com cable run, from lower helm to bilge 3. Need to figure a way to get thUpgrades
11 Jun 2025Met Tony to assist with sounder cable install /Chain Counter cable installation / Dismantled main bed assembly to seek access to 2nd bilge compartment, no access under bed found.Upgrades
10 Jun 2025Relocate vessel to B10 1 hr No ChargeDeliveries
10 Jun 2025Moved vessel to B10 1 hr No ChargeDeliveries
05 Jun 2025Passerelle door repairs / Removed Passarel door for repaint Drilled out corroded bolts retapped thread holes, supplied new bolts.Repairs
04 Jun 2025Create tool inventory for vessle & quotes / Removed washing machine for replacement / repairRepairs
02 Jun 2025Moved vessel to super yacht jetty /Pumped up inflatable chambers on black tender //Launch tender/ Found bilge pump not working / Found fizzed connector and repaired /Recovered tender to trailer /Picked up white tender from SD MariRepairs